Adams Dairy Parkway- Lee’s Summit, MO
|
|
|
Damon Pursell Construction completed the Adams Dairy Parkway in Lee’s Summit, Missouri for the City of Blue Springs, Missouri. This work included: Construction of 1.5 miles of new roadway, including: Clearing, Grading, Storm Sewer, Waterline, Sanitary Sewer relocation, Electrical Duct Bank, Curb, Asphalt Pavement, Sidewalks, Seeding and Erosion Control. Also included with this project was the placement of a 12’ x 12’ triple cell precast box culvert. Total contract amount being $4,369,600.00.
|
|
|
West Platte Road - Roadway & Levee Const.
|
|
|
Damon Pursell Construction completed the West Platte Road for the City of Riverside, Missouri. This work included: Reconstruction of 3/4 of a mile of existing street from two lane unimproved road to four lane divided City street with turn lanes. All work done while maintaining traffic busy two way traffic. The project includes: Storm Sewers, Corps of Engineers Levee. Total contract amount being $3,075,400.00.
|
|
|
South Baker Road - Sugar Creek, Missouri
|
|
|
Damon Pursell Construction completed the South Baker Road in Sugar Creek, Missouri for Waste Management of Missouri. This work included: Roadway Construction - Grading, Concrete Curbs, Asphalt Paving, Retaining Walls and Seeding. Total contract amount being $432,102.00
|
|
 |
 |
 |
|
Todd George Road, Phase 3 Lee’s Summit, MO
|
|
|
|
Damon Pursell Construction completed the Todd George Road, Lee’ Summit, Missouri for the City of Lee’s Summit. This project was the winner of an APWA award Transportation Public Works Project of the Year. The project required the construction of a 1 mile of new four lane divided City Street including: Clearing, Grading, Storm Sewer, Curbs, Paving, Sidewalks, Fencing, Seeding, Trees, and Modular Block Walls. This project included the construction and placement of a 12’ x 8’ double cell precast box culvert. Total contract amount being $2,599,,000.00.
|
|
|
High Drive- City of Riverside, MO
|
|
|
|
Damon Pursell Construction completed the High Drive for the City of Riverside, Missouri. We took this project over from a previous contractor that was removed from the project by the City due to delays. The work was the reconstruction of an unimproved two lane City Street including: Grading, Paving, Masonry walls, Fencing, Sodding, Landscaping, Driveways, Sidewalks, Traffic Control, and Pavement Striping. Total contract amount being $1,480,000.00
|
|